Close Menu
NCIJ Network NCIJ Network
    What's Hot

    Ajay Banga Is on a Mission to Create Jobs. Here’s How He Plans to Do It.

    September 24, 2026

    Israel facing water shortages caused by destruction of Gaza’s treatment plants | Israel

    September 24, 2026

    Accessibility: Europe’s hidden growth engine – POLITICO

    September 24, 2026
    Facebook X (Twitter) Instagram
    Trending
    • Ajay Banga Is on a Mission to Create Jobs. Here’s How He Plans to Do It.
    • Israel facing water shortages caused by destruction of Gaza’s treatment plants | Israel
    • Accessibility: Europe’s hidden growth engine – POLITICO
    • H&R Block Coupon: 25% Off DIY + Tax Pro Assist
    • Anthropic and OpenAI Models Still Attempt Restricted Actions in Safety Tests
    • CFTC Chair Is Preparing For ‘On-Chain’ Markets
    • More REM sleep linked to lower risk of 83 diseases
    • Planned US tech hub in Philippines hit over environmental and Indigenous land concerns
    • About
      • Our Team
      • Editorial Policy
      • Editorial Independence
      • International Support
    • Trust & Standards
      • AI Usage Policy
      • Conflict of Interest Policy
      • Corrections Policy
      • Ethics Policy
      • Fact-Checking Policy
      • Source Protection
    • Get Involved
      • Guide for Sources
      • Support Independent Journalism
    • Legal
      • Cookie Policy
      • Privacy Policy
      • Terms of Use
    Facebook X (Twitter) Instagram
    NCIJ Network NCIJ Network
    Thursday, September 24
    • Home
    • World
    • Ai
    • Business
    • Politics
    • Health
    • Crypto
    • Science
    • Technology
    • Cybersecurity
    • Defense & Security
    • Economy
    • Energy
    • Europe
    • More
      • Fact Check
      • Investigations
      • Opinion & Analysis
      • Environment
    NCIJ Network NCIJ Network
    Home»Environment

    Planned US tech hub in Philippines hit over environmental and Indigenous land concerns

    NCIJ NETWNCIJ NETWORKBy NCIJ NETWNCIJ NETWORKSeptember 24, 2026 Environment No Comments8 Mins Read
    Share
    Facebook Twitter LinkedIn Pinterest Email

    • The Philippines is a key location for the U.S.-led Pax Silica initiative, a global pact to establish a semiconductor and AI supply chain not reliant on China.
    • Pax Silica, and a related national initiative called the Luzon Economic Corridor, have been met with opposition from civil society and Indigenous groups.
    • Land for the planned Pax Silica hub overlaps with land thousands of Indigenous Aeta claim as their ancestral domain.
    • Protesters also cite concerns about water, energy use, and waste management plans for the planned hub.

    MANILA — Philippine President Ferdinand Marcos Jr. arrived at the Grand Hyatt Manila on Sept. 10 to address hundreds of foreign business representatives assembled for the Luzon Economic Corridor investors’ forum.

    Outside the hotel, hundreds of demonstrators had also gathered, carrying signs that read “No to Pax Silica!” The scene reflected both the government’s ambitious plans to ride the artificial intelligence wave, and deep ambivalence in civil society.

    Police confronted the crowd, shoving them with riot shields and batons on the street outside the hotel lobby.

    Activists say police injured at least 27 protesters and arrested five. Police, meanwhile, reported minor cuts and injuries to 16 personnel.

    Protester Jona Yang, from the activist-scientist group AGHAM, said she was negotiating with the police to cool tensions when they arrested her.

    “We want the Marcos government and investors to see the outrage all of this has caused,” Yang told Mongabay. “They’re taking away our resources and our lands.”

    Hundreds of protesters gathered outside the Luzon Economic Corridor (LEC) investors’ forum on Sept. 10. Image by Michael Beltran for Mongabay.

    Pax Silica

    The Luzon Economic Corridor, or LEC, is an economic initiative focused on the Philippines’ biggest island, begun in 2024. Pax Silica, the U.S.-led global pact for an AI and semiconductor supply chain not reliant on China, includes the LEC. In April 2026, Washington and Manila announced plans to build a 1,620-hectare (4,000-acre) high-tech manufacturing hub in the Central Luzon region.

    Pax Silica has become a lightning rod for political and environmental contentions. The government maintains it’s a boon for the Philippines’ economy. But opponents of the project, including Indigenous and local communities currently living on the land designated for the project, say it’s an international land and resource grab in the name of U.S. AI ambitions.

    U.S. Secretary of State Marco Rubio visited Manila in July 2026 to affirm bilateral commitment to the project, with a final agreement slated for signing in November 2026.

    At the LEC forum, Pax Silica was discussed behind closed doors, and officials gave few details about its future.

    Angela Ignacio, an undersecretary at the Philippine Department of Finance, told reporters it would be premature to share any details on Pax Silica before plans are finalized. But she did call it a chance for the Philippines to become a “global player when it comes to technologies that will shape the future.”

    Heather Variava, senior adviser to the U.S. State Department’s Bureau of Economic, Energy, and Business Affairs, added that “the goal of the U.S. is always to be an additive, to bring more power, to bring water, to bring more benefits to the Philippines.”

    ‘Most to lose’

    The Pax Silica hub will be built within New Clark City, a government-planned “smart” city inside the greater 32,000-hectare (79,000-acre) Clark area, a former U.S. military complex.

    Clark is titled and managed by the Bases Conversion and Development Authority (BCDA), an office under the supervision of the president.

    At a press briefing, BCDA chief Joshua Bingcang shared a “conservative” estimate that the facility would need around 3 gigawatts of energy to run. He also said that it would be green and mainly solar powered.

    “We are blessed with 300 days of sunshine,” Bingcang added.

    Running consistently, the Pax Silica facility would demand about 26.3 terawatt-hours each year; by contrast, the Philippines’ entire service sector consumed about 28 TWh in 2024.

    Giovanni Tapang, former dean at the University of the Philippines’ College of Science and a convenor of the Network Opposed (NO) to Pax Silica, told Mongabay that the Philippines has the “most to lose” among the 25 nations involved in the pact as it chains domestic resources to U.S. policies.

    “How many thousands of hectares will they be taking from farmers to build solar panels? And if we’re generating all this clean energy, why let the U.S. use it instead of local households?” Tapang said.

    Protestors gathered outside the Grand Hyatt Manila
    Protestors gathered outside the Grand Hyatt Manila on Sept. 10, 2026, holding signs calling for Pax Silica to be scrapped. Image by Michael Beltran for Mongabay.

    The BCDA initially said that data centers could be part of the Pax Silica. But Bingcang and the president’s office later denied this in a September press briefing where he emphasized it would be a semiconductor facility.

    A document shared at the LEC forum listed data centers as part of the planned infrastructure in New Clark City. It did not specify whether the data centers would be built inside the Pax Silica hub.

    Bingcang said the Pax Silica hub would also consume about 60 million to 90 million liters (16 million to 24 million gallons) of water each day, sourced from rainwater via an impounding dam.

    “We can ramp it up to 300 million liters [79 million gallons] a day with the available technology,” he told reporters in Filipino.

    Tapang voiced concerns about how the BCDA’s plan would work during the Philippines’ dry season, which runs from December to May. “This is the same period where farmers need their water for irrigation,” he said.

    The BCDA says it intends to house mineral processing technology as well. Thony Dizon of the advocacy group BAN Toxics said the government has yet to reveal anything about how it will manage the resulting waste.

    “How will the government ensure that after 30 years, we are not left with a contaminated environment and depleted natural resources?” Dizon said.

    Land dispute

    The United States’ history with Clark dates back to a military base established in 1903, when the Philippines was under U.S. colonial rule. The base remained under U.S. military control until 1991, 45 years after the Philippines gained independence, when Clark finally came under the control of the Philippine government.

    Long before that, historians argue, the area was the ancestral territory of the Aetas, considered to be some of the earliest settlers on the archipelago.

    The Pax Silica site, located within the 9,450-hectare (23,350-acre) New Clark City, overlaps with the ancestral domain claims of thousands of Aetas. A survey of the land by Arnisson Andre Ortega, a professor at Syracuse University in the U.S. and a member of the geographer group Countermapping Ph, revealed that planned construction for Pax Silica would impede on the lands of at least three existing Aeta villages.

    “There is no ancestral domain title in that area,” BCDA chief Bingcang said, denying that the project would displace anybody.

    Gloria Capiz-Estabillo, 76, an elder of the Aeta Hungey tribe, told Mongabay that the BCDA has already begun informing Aetas that they need to leave the land.

    “They’re setting up right in the middle of our land. Where are we going to live? How about our crops? Where will they take us, just drop us in the ocean?” Estabillo told Mongabay in Filipino.

    Gloria Capiz-Estabillo
    Gloria Capiz-Estabillo, 76, is one of the elders of the Aeta Hungey tribe. She said tribal members have already been told by the Bases Conversion and Development Authority to leave their land. Image by Michael Beltran.

    To gain land rights, Indigenous peoples must apply for what’s known as a certificate of ancestral domain title (CADT) from the National Commission on Indigenous Peoples (NCIP).

    Aetas in Clark have been lobbying for a CADT since 1994, but have been beset by frequent delays as the impoverished communities struggle to complete the minimum requirements needed: a detailed area map, a population census, genealogy of at least five clans covering the past three generations, and elder testimonies.

    Ortega said the process has lagged for decades under “Indigenous-unfriendly” red tape involving the BCDA and the NCIP.

    “The absence of a formal title does not invalidate their claim to their ancestral lands; rather, it highlights a critical lack of government support,” Ortega told Mongabay.

    By contrast, the Pax Silica hub is supported by the Investor’s Lease Act, signed by President Marcos Jr. in September 2025, which allows foreign businesses to lease commercial and industrial lands for up to 99 years.

    The second day of the LEC forum was held in New Clark City. The BCDA led a field visit for the hundreds of prospective businesses. Hundreds of protesters continued to hound them, joined by nearby Aeta communities.

    “They’ll have to kill us to take us off this land,” Estabillo said.

    Banner image: Protesters outside the Grand Hyatt Manila on Sept. 10 called for an end to the Pax Silica pact. Image by Michael Beltran for Mongabay.

    Cite this article

    Michael Beltran (2026). Planned US tech hub in Philippines hit over environmental and Indigenous land concerns. Mongabay Conservation news. DOI: https://doi.org/10.66709/news-330602





    concerns environmental hit hub Indigenous land Philippines planned tech
    NCIJ NETWNCIJ NETWORK
    • Website

    Keep Reading

    Floating weeds threaten farming and fishing at Malawi’s Chia Lagoon

    Super El Niño to Cause 451,000 Heat Deaths

    Court Nixes Michigan’s Novel Antitrust Case Targeting Big Oil 

    US contractors reportedly purchase tin from company accused of illegal Amazon mining

    Chemicals Linked to Breast Cancer Are ‘Ubiquitous,’ Study Shows

    Logging still threatens Bornean forest once envisioned as an Indigenous-led peace park

    Add A Comment
    Leave A Reply Cancel Reply

    Editors Picks

    Ajay Banga Is on a Mission to Create Jobs. Here’s How He Plans to Do It.

    September 24, 2026

    Israel facing water shortages caused by destruction of Gaza’s treatment plants | Israel

    September 24, 2026

    Accessibility: Europe’s hidden growth engine – POLITICO

    September 24, 2026

    H&R Block Coupon: 25% Off DIY + Tax Pro Assist

    September 24, 2026
    Latest Posts

    Ransom Cartel ransomware creator sentenced to 16 years in prison

    August 5, 2026

    Uber CEO brushes off reports of a Waymo break-up

    August 5, 2026

    Fauci Faces Contempt Vote. Here Are the Legal Issues Involved.

    August 6, 2026

    Subscribe to News

    Get the latest sports news from NewsSite about world, sports and politics.

    NCIJ Network is an independent digital news platform delivering trusted investigative journalism, European and global news, in-depth analysis, and fact-based reporting with accuracy, transparency, and integrity.

    Facebook X (Twitter) Instagram Pinterest YouTube

    Ajay Banga Is on a Mission to Create Jobs. Here’s How He Plans to Do It.

    September 24, 2026

    Israel facing water shortages caused by destruction of Gaza’s treatment plants | Israel

    September 24, 2026

    Accessibility: Europe’s hidden growth engine – POLITICO

    September 24, 2026

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    Type above and press Enter to search. Press Esc to cancel.