Close Menu
NCIJ Network NCIJ Network
    What's Hot

    Close Identity Gaps in Software Development Before Unleashing AI

    October 20, 2026

    Inside Health – How self-injecting culture is bringing new dangers

    October 20, 2026

    US deep-sea mining claims in Pacific’s high seas now rival the area set aside by international regulator

    October 20, 2026
    Facebook X (Twitter) Instagram
    Trending
    • Close Identity Gaps in Software Development Before Unleashing AI
    • Inside Health – How self-injecting culture is bringing new dangers
    • US deep-sea mining claims in Pacific’s high seas now rival the area set aside by international regulator
    • Here’s how to get a free photo ID before the Nov. 3 election
    • Trump’s Farmer Bailout Aims to Rally Midterm Support 
    • Zelensky says US intelligence sharing ‘works now’ after talks with Trump envoy in Oslo
    • Jane Dodds standing down as Welsh Liberal Democrats leader
    • Nige seems tired and bored of himself as Kemi conjures a telepathic budget | John Crace
    • About
      • Our Team
      • Editorial Policy
      • Editorial Independence
      • International Support
    • Trust & Standards
      • AI Usage Policy
      • Conflict of Interest Policy
      • Corrections Policy
      • Ethics Policy
      • Fact-Checking Policy
      • Source Protection
    • Get Involved
      • Guide for Sources
      • Support Independent Journalism
    • Legal
      • Cookie Policy
      • Privacy Policy
      • Terms of Use
    Facebook X (Twitter) Instagram
    NCIJ Network NCIJ Network
    Tuesday, October 20
    • Home
    • World
    • Ai
    • Business
    • Politics
    • Health
    • Crypto
    • Science
    • Technology
    • Cybersecurity
    • Defense & Security
    • Economy
    • Energy
    • Europe
    • More
      • Fact Check
      • Investigations
      • Opinion & Analysis
      • Environment
    NCIJ Network NCIJ Network
    Home»Energy

    WATCH: $12.5B gas project closing in on first LNG cargo as 10-storey module comes to Australia

    NCIJ NETWNCIJ NETWORKBy NCIJ NETWNCIJ NETWORKSeptember 2, 2026 Energy No Comments3 Mins Read
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Australia’s energy giant Woodside has confirmed the arrival of the final and heaviest module for its liquefied natural gas (LNG) project upgrade, emphasizing that a 10-story, 4,500-ton structure marks another step toward the first LNG cargo from its $12.5 billion gas project in the fourth quarter of 2026.

    Delivery of Pluto LNG module for Scarborough gas project; Source: Woodside

    While announcing that the last and heaviest module for Pluto LNG’s Train 1 (T1) modifications project in Karratha was delivered to the site in Western Australia, Woodside said the arrival put an end to four years of planning, fabrication and shipping.

    The modifications project involves upgrading Pluto LNG’s T1 facility to process gas from the Scarborough field, described as a key part of the Scarborough energy project, which was 98% complete at the end of the second quarter of 2026 and is on track for first LNG cargo in Q4 2026.

    The final module, standing as tall as a 10-storey building and weighing about 4,500 tons, is perceived to be one of the heaviest ever delivered to the Pilbara. The story of this module began in London, where the planning included its front-end design, while fabrication was conducted over two years in Thailand.

    Fiachra Gleeson, Construction Manager, stated: “Every part of the route – from bridges, drainage, above- and below-ground services plus foundations – was analysed in detail to ensure the path of the module didn’t clash with anything along the way.

    “Seeing that final module arrive and knowing what it took to get it here is something everyone involved should be proud of. This has been a massive One Team effort.”

    This content is available after accepting the cookies.

    With the module in its final position, the focus has shifted to installation, hook-up and integration with Pluto Train 1. This comes months after the Scarborough floating production unit (FPU) completed hook-up of the umbilical and all subsea risers and began topside commissioning, following its arrival in Australia.

    Once operational, Scarborough will help support energy security in Western Australia and the Asia-Pacific region, with the project expected to produce enough energy to power more than 8.5 million homes for more than 30 years.

    Delivery of Pluto LNG module for Scarborough gas project; Source: Woodside

    Woodside underlined: “Such a massive module required a big workforce: the engineering, procurement and construction management contractor, some 2,000 site workers, 10 Woodsiders and assistance from our Australia-based employees all played important parts.

    “The team delivered three fully integrated modules containing thousands of tonnes of structural steel, extensive piping and complex equipment. Shipping the final module across almost 2,500 nautical miles to its final destination was no easy feat, either.”

    OE logo

    Power Your Brand With Offshore Energy ⤵️

    Take the spotlight and anchor your brand in the heart of the offshore world!

    Join us for a bigger impact and amplify your presence at the core hub of the offshore energy community!

    10storey 12.5B Australia cargo closing gas LNG module Project watch
    NCIJ NETWNCIJ NETWORK
    • Website

    Keep Reading

    NASA’s SR-1 Freedom Advances with Progress on Nuclear Power Module

    UK’s first HVDC subsea cable factory opens in Scotland

    United Oil & Gas eyes billion-barrel Jamaican drilling targets as it maps out next steps

    Perenco brings ‘complex’ North Sea P&A and infrastructure removal campaign to an end

    EU backs cross-border CO2 transport and storage project with €223 million

    Folegandros island joins Greece’s mainland power grid via 60-kilometer subsea cable

    Add A Comment
    Leave A Reply Cancel Reply

    Editors Picks

    Close Identity Gaps in Software Development Before Unleashing AI

    October 20, 2026

    Inside Health – How self-injecting culture is bringing new dangers

    October 20, 2026

    US deep-sea mining claims in Pacific’s high seas now rival the area set aside by international regulator

    October 20, 2026

    Here’s how to get a free photo ID before the Nov. 3 election

    October 20, 2026
    Latest Posts

    How AAU Failed to Protect Young Athletes From Sexual Abuse — ProPublica

    August 13, 2026

    So Much Solar: Digging Into the List of Every US Power Plant That Went Online This Year

    August 13, 2026

    Dogs can tell fear from sadness — and scientists saw it in their brains

    August 13, 2026

    Subscribe to News

    Get the latest sports news from NewsSite about world, sports and politics.

    NCIJ Network is an independent digital news platform delivering trusted investigative journalism, European and global news, in-depth analysis, and fact-based reporting with accuracy, transparency, and integrity.

    Facebook X (Twitter) Instagram Pinterest YouTube

    Close Identity Gaps in Software Development Before Unleashing AI

    October 20, 2026

    Inside Health – How self-injecting culture is bringing new dangers

    October 20, 2026

    US deep-sea mining claims in Pacific’s high seas now rival the area set aside by international regulator

    October 20, 2026

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    Type above and press Enter to search. Press Esc to cancel.