Close Menu
NCIJ Network NCIJ Network
    What's Hot

    Congressman says TikTok backed out of a meeting to avoid child safety questions

    September 3, 2026

    NVIDIA to acquire Hugging Face for $12.93B

    September 3, 2026

    HPE patches critical ArubaOS-CX remote code execution flaw

    September 3, 2026
    Facebook X (Twitter) Instagram
    Trending
    • Congressman says TikTok backed out of a meeting to avoid child safety questions
    • NVIDIA to acquire Hugging Face for $12.93B
    • HPE patches critical ArubaOS-CX remote code execution flaw
    • Wallet Recovery Experts Crack $1B ETH Wallet… But Find Just $10
    • Bats carry dangerous viruses without getting sick. This may be why
    • Smulders HSM, SPIE and Scaldis help future-proof offshore wind-powered North Sea gas platform
    • The Guardian view on press freedom: to defend democracy, stand up for journalists | Editorial
    • ‘Fight through darkness, water’: Nepal survivor recounts escape from flood-hit tunnel
    • About
      • Our Team
      • Editorial Policy
      • Editorial Independence
      • International Support
    • Trust & Standards
      • AI Usage Policy
      • Conflict of Interest Policy
      • Corrections Policy
      • Ethics Policy
      • Fact-Checking Policy
      • Source Protection
    • Get Involved
      • Guide for Sources
      • Support Independent Journalism
    • Legal
      • Cookie Policy
      • Privacy Policy
      • Terms of Use
    Facebook X (Twitter) Instagram
    NCIJ Network NCIJ Network
    Thursday, September 3
    • Home
    • World
    • Ai
    • Business
    • Politics
    • Health
    • Crypto
    • Science
    • Technology
    • Cybersecurity
    • Defense & Security
    • Economy
    • Energy
    • Europe
    • More
      • Fact Check
      • Investigations
      • Opinion & Analysis
      • Environment
    NCIJ Network NCIJ Network
    Home»Energy

    Smulders HSM, SPIE and Scaldis help future-proof offshore wind-powered North Sea gas platform

    NCIJ NETWNCIJ NETWORKBy NCIJ NETWNCIJ NETWORKSeptember 3, 2026 Energy No Comments4 Mins Read
    Share
    Facebook Twitter LinkedIn Pinterest Email

    An integrated project team comprising Smulders HSM, a provider of multidisciplinary offshore platform solutions, SPIE, a multi-technical services provider, and offshore installation partner Scaldis, has been tasked with handling the next phase of a gas project in the Dutch North Sea, with a new compression module set to extend the operating life of the asset’s offshore platform, which is running on offshore wind energy.

    Platform N05-A in the North Sea; Source: ONE-Dyas

    The Netherlands-headquartered ONE-Dyas, as the operator of the N05-A platform, has awarded Smulders HSM a contract to build and integrate a new compression module that will enable efficient gas production from the N05-A field in the future. The module is expected to be integrated into the existing platform from June 2027.

    Smulders HSM will work with SPIE and Scaldis to deliver the project as an integrated team, with the companies aiming to reduce interfaces between contractors and streamline decision-making throughout the engineering, procurement, construction and installation (EPCI) phases.

    SPIE, which is acting as Smulders HSM’s multi-technical partner, will deliver the heating, ventilation and air conditioning (HVAC), mechanical, and electrical and instrumentation (E&I) scope for the compression module.

    The firm underlined: “Combining these disciplines within a single organization reduces the number of interfaces, streamlines communication and improves overall execution efficiency. This multidisciplinary approach offers significant benefits, particularly when integrating new installations into an existing offshore platform.”

    The module will comprise two independent compression trains, allowing the platform to continue operating under varying pressure conditions as reservoir characteristics change over time. The N05-A platform, which has been operational since March 2025, is the first offshore gas production platform in the North Sea to operate entirely on electricity generated by offshore wind power, according to SPIE.

    The platform uses electricity from the German offshore wind farm Riffgat, helping to reduce its direct operational emissions compared with conventional offshore gas production powered by fossil fuels. The new compression module is designed to enable longer and more efficient gas production from the N05-A field, while making greater use of the existing offshore infrastructure.

    The North Sea project went through years of preparation, several hurdles, a court-ordered temporary halt of operations due to opposition from climate activists, and a provisional ruling that enabled the operator to move forward with its planned activities.

    Marthijn van Dessel, Sector Director at SPIE in the Netherlands, commented: “The fact that ONE-Dyas and Smulders HSM have once again chosen to work with us for this next phase speaks volumes. We know the platform, we know each other, and we deliver HVAC, mechanical and E&I as a single integrated package.

    “This reduces the need for coordination between multiple parties, streamlines communication and enables more efficient project execution. Ultimately, that improves quality, schedule reliability and the overall predictability of project delivery.”

    The compression module addition comes as the Netherlands continues to transition its energy system while maintaining natural gas as part of its energy mix. SPIE claims that the N05-A project demonstrates how electrification and existing infrastructure can be combined to curb the direct emissions associated with offshore gas production.

    SPIE noted: “As the Netherlands continues its energy transition natural gas will remain part of the energy mix for the foreseeable future. The challenge is therefore to produce it as efficiently and with as few emissions as possible.

    “N05-A illustrates this approach: an electrified offshore platform powered by wind energy, demonstrating how innovative technology can significantly reduce the direct operational emissions associated with energy production.”

    The Dutch-German energy project is situated in the border segment, where several small fields together contribute to a stable energy supply for the Netherlands and Germany, with an estimated potential of about 50 billion cubic meters of natural gas in the so-called Gateway to the Ems (GEMS) area.

    By integrating the new compression module, the partners, ONE-Dyas, EBN, and Tenaz Energy, aim to extend the productive life of the N05-A field while continuing to operate the platform using electricity generated by offshore wind.

    OE logo

    Power Your Brand With Offshore Energy ⤵️

    Take the spotlight and anchor your brand in the heart of the offshore world!

    Join us for a bigger impact and amplify your presence at the core hub of the offshore energy community!

    futureproof gas HSM North offshore Platform Scaldis Sea Smulders SPIE windpowered
    NCIJ NETWNCIJ NETWORK
    • Website

    Keep Reading

    Nvidia strikes $12.9bn deal to buy AI platform Hugging Face

    Woodside, Pemex eye new Gulf of Mexico deepwater oil & gas exploration opportunities

    Keeping fuel options open as uncertainty drives tri-fuel-ready tanker concept

    Nvidia to buy open-source AI platform Hugging Face for $13bn

    Real-time ocean data exists. It’s about time the industry uses it.

    UK oil & gas player, floating wind developer to explore electrification opportunities in North Sea

    Add A Comment
    Leave A Reply Cancel Reply

    Editors Picks

    Congressman says TikTok backed out of a meeting to avoid child safety questions

    September 3, 2026

    NVIDIA to acquire Hugging Face for $12.93B

    September 3, 2026

    HPE patches critical ArubaOS-CX remote code execution flaw

    September 3, 2026

    Wallet Recovery Experts Crack $1B ETH Wallet… But Find Just $10

    September 3, 2026
    Latest Posts

    Ultrafast X-rays capture chemistry unfolding atom by atom

    July 31, 2026

    How a PPE company’s highly publicized $32M Bitcoin strategy quietly expired without purchasing a single coin

    July 31, 2026

    Critical Flaw Led to Azure Cosmos DB Pwnage

    July 31, 2026

    Subscribe to News

    Get the latest sports news from NewsSite about world, sports and politics.

    NCIJ Network is an independent digital news platform delivering trusted investigative journalism, European and global news, in-depth analysis, and fact-based reporting with accuracy, transparency, and integrity.

    Facebook X (Twitter) Instagram Pinterest YouTube

    Congressman says TikTok backed out of a meeting to avoid child safety questions

    September 3, 2026

    NVIDIA to acquire Hugging Face for $12.93B

    September 3, 2026

    HPE patches critical ArubaOS-CX remote code execution flaw

    September 3, 2026

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    Type above and press Enter to search. Press Esc to cancel.