Close Menu
NCIJ Network NCIJ Network
    What's Hot

    Šefčovič: Verhandlung mit China noch ohne Ergebnisse – POLITICO

    October 2, 2026

    Welsh first minister calls on Burnham to deliver ‘new deal’ on devolution | Rhun ap Iorwerth

    October 2, 2026

    Conservatives aim to be election-ready ahead of party conference

    October 2, 2026
    Facebook X (Twitter) Instagram
    Trending
    • Šefčovič: Verhandlung mit China noch ohne Ergebnisse – POLITICO
    • Welsh first minister calls on Burnham to deliver ‘new deal’ on devolution | Rhun ap Iorwerth
    • Conservatives aim to be election-ready ahead of party conference
    • Decisions taken by the Governing Council of the ECB (in addition to decisions setting interest rates)
    • Laytr’s new app lets you save anything you find online, not just articles to read
    • Datalab Introduces OmniExtractBench to Fix Bias and Opacity in Extraction Benchmarks
    • US sanctions Tren de Aragua gang members in ATM hacks crackdown
    • EU Issuers Explain Why Europe Needs US Dollar Stablecoins
    • About
      • Our Team
      • Editorial Policy
      • Editorial Independence
      • International Support
    • Trust & Standards
      • AI Usage Policy
      • Conflict of Interest Policy
      • Corrections Policy
      • Ethics Policy
      • Fact-Checking Policy
      • Source Protection
    • Get Involved
      • Guide for Sources
      • Support Independent Journalism
    • Legal
      • Cookie Policy
      • Privacy Policy
      • Terms of Use
    Facebook X (Twitter) Instagram
    NCIJ Network NCIJ Network
    Friday, October 2
    • Home
    • World
    • Ai
    • Business
    • Politics
    • Health
    • Crypto
    • Science
    • Technology
    • Cybersecurity
    • Defense & Security
    • Economy
    • Energy
    • Europe
    • More
      • Fact Check
      • Investigations
      • Opinion & Analysis
      • Environment
    NCIJ Network NCIJ Network
    Home»Energy

    VARD welcomes NKT’s cable layer to Norway for final outfitting and commissioning

    NCIJ NETWNCIJ NETWORKBy NCIJ NETWNCIJ NETWORKAugust 17, 2026 Energy No Comments2 Mins Read
    Share
    Facebook Twitter LinkedIn Pinterest Email

    NKT’s new cable-laying vessel (CLV) NKT Eleonora, which will be able to run on both methanol and HVO/marine diesel oil, has arrived from Romania to Norway for the next phase of outfitting and commissioning.

    Source: VARD via LinkedIn (Screenshot)

    The official keel laying for the vessel took place in January 2025, some two months after the first steel was cut. It was then reported in April 2026 that its hull had been launched into the water at Vard’s shipyard in Tulcea, Romania.

    NKT announced on July 20 that NKT Eleonora had departed Vard Shipyards Romania in Tulcea and is on its way to Vard Brattvaag, Norway, for the next phase of construction.

    The CLV will now enter the next phase of outfitting and commissioning, with delivery scheduled for Q1/Q2 2027.

    NKT Eleonora will feature Wärtsilä 32 methanol engines, with the company also supplying the front tunnel and azimuth thruster. NOV REMACUT is delivering the cable lay system, cranes and mission equipment, and ABB its Onboard DC Grid power distribution system.

    The 176.5-meter-long CLV was designed by Salt Ship Design. Equipped with three turntables, it will offer a cable-laying capacity of 23,000 tons.

    OE logo

    Power Your Brand With Offshore Energy ⤵️

    Take the spotlight and anchor your brand in the heart of the offshore world!

    Join us for a bigger impact and amplify your presence at the core hub of the offshore energy community!

    Cable commissioning Final Layer NKTs Norway outfitting VARD welcomes
    NCIJ NETWNCIJ NETWORK
    • Website

    Keep Reading

    $50 billion South Korean investment pushes stalled Alaska LNG project closer to construction

    BP taking the wheel of Namibian license trio as farm-in deal clear final regulatory gate

    Brazil Election: Lula, Flávio Bolsonaro Vie for Swing Votes in Final Days

    Petrobras strikes another oil-bearing zone in Equatorial Margin frontier

    It’s true: this is my final column. You have exactly 24 hours to complain before my inbox self-destructs | Marina Hyde

    DOF gets ‘large’ booking for its vessel to undertake undisclosed subsea campaign

    Add A Comment
    Leave A Reply Cancel Reply

    Editors Picks

    Šefčovič: Verhandlung mit China noch ohne Ergebnisse – POLITICO

    October 2, 2026

    Welsh first minister calls on Burnham to deliver ‘new deal’ on devolution | Rhun ap Iorwerth

    October 2, 2026

    Conservatives aim to be election-ready ahead of party conference

    October 2, 2026

    Decisions taken by the Governing Council of the ECB (in addition to decisions setting interest rates)

    October 2, 2026
    Latest Posts

    Lime bikes hurtling around the city: is this the revenge of a priced-out generation? | Andy Beckett

    August 8, 2026

    Clarity Act Delayed Until September, Trump Praises Bitcoin

    August 8, 2026

    North Carolina Ports confirms cyberattack disrupting operations

    August 8, 2026

    Subscribe to News

    Get the latest sports news from NewsSite about world, sports and politics.

    NCIJ Network is an independent digital news platform delivering trusted investigative journalism, European and global news, in-depth analysis, and fact-based reporting with accuracy, transparency, and integrity.

    Facebook X (Twitter) Instagram Pinterest YouTube

    Šefčovič: Verhandlung mit China noch ohne Ergebnisse – POLITICO

    October 2, 2026

    Welsh first minister calls on Burnham to deliver ‘new deal’ on devolution | Rhun ap Iorwerth

    October 2, 2026

    Conservatives aim to be election-ready ahead of party conference

    October 2, 2026

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    Type above and press Enter to search. Press Esc to cancel.