Manual operation is a designed capability, not a folk memory. It requires procedures that exist on paper — literally on paper, because the HMI may be what you just lost — people trained on them, and decision rights assigned in advance. The sector had, in fact, just rehearsed this: EPA’s 2026 National Cyber Drill on July 8 — 18 days before Minnesota — put utilities through precisely that scenario, operating with SCADA remote connectivity, cloud services and communications degraded or unavailable. Whether that capability actually exists at your site is testable: I’ve published a free, browser-based Island Mode 72-hour stress test — one of six no-signup companion tools I maintain openly on GitHub — that walks a site through exactly this question, from credential caches to offline backups. Joint guidance issued by CISA with its Australian, British and Canadian counterparts in late July makes the same point at doctrine level: Maintain isolation and recovery plans so essential services continue under degraded conditions, through manual or alternative SCADA paths.
The decision-rights half is the part most plans skip. Which systems may a SOC or an MSSP isolate unilaterally, and which require the operator who understands the process? That is the containment paradox I wrote about in these pages two weeks ago, and the water-sector version is identical: The artifact is one page, the conversation that produces it takes an afternoon, and the absence of it is what turns a two-hour incident into a two-day one.
The response calendar
Within 72 hours: Kill every direct external path and public IP, pull the carrier bill and flag every SIM you cannot map to a device, preserve gateway and engineering-workstation logs, verify the physical process against local indicators and upload the running logic from each critical controller to compare against your archive.