Close Menu
NCIJ Network |NCIJ Network |
    What's Hot

    The Guardian view on social care reform: Andy Burnham is right – this issue must be gripped | Editorial

    July 23, 2026

    Zelensky’s Dizzying U-Turn Is the Latest Zigzag in a Presidency Full of Them

    July 23, 2026

    Le parquet de Paris ouvre une enquête sur le site “libertin” Wyylde

    July 23, 2026
    Facebook X (Twitter) Instagram
    Trending
    • The Guardian view on social care reform: Andy Burnham is right – this issue must be gripped | Editorial
    • Zelensky’s Dizzying U-Turn Is the Latest Zigzag in a Presidency Full of Them
    • Le parquet de Paris ouvre une enquête sur le site “libertin” Wyylde
    • Burnham’s review of prison early release scheme is causing chaos, says union | Prisons and probation
    • Faisal Islam: Andy Burnham has big ideas – but what will they cost?
    • Monetary policy decisions
    • Experts say exploiting Anthropic’s Fable isn’t how Kimi K3 got so good
    • Nvidia bets physical AI can solve healthcare robotics’ data problem
    • About
      • Our Team
      • Editorial Policy
      • Editorial Independence
      • International Support
    • Trust & Standards
      • AI Usage Policy
      • Conflict of Interest Policy
      • Corrections Policy
      • Ethics Policy
      • Fact-Checking Policy
      • Source Protection
    • Get Involved
      • Guide for Sources
      • Support Independent Journalism
    • Legal
      • Cookie Policy
      • Privacy Policy
      • Terms of Use
    Facebook X (Twitter) Instagram
    NCIJ Network |NCIJ Network |
    Thursday, July 23
    • Home
    • World
    • Ai
    • Business
    • Politics
    • Health
    • Crypto
    • Science
    • Technology
    • Cybersecurity
    • Defense & Security
    • Economy
    • Energy
    • Europe
    • More
      • Fact Check
      • Investigations
      • Opinion & Analysis
      • Environment
    NCIJ Network |NCIJ Network |
    Home»Energy

    Half of cabling in place for first UK-Germany energy link

    NCIJ NETWNCIJ NETWORKBy NCIJ NETWNCIJ NETWORKJuly 23, 2026 Energy No Comments2 Mins Read
    Share
    Facebook Twitter LinkedIn Pinterest Email

    With over 350 kilometers of offshore and onshore cable laid, the NeuConnect high-voltage submarine cable that will create the first direct energy transmission link between the UK and Germany has reached the halfway point in its cabling program.

    The milestone comes as NeuConnect marks the third anniversary since major onshore construction work began in July 2023, and coincides with the first anniversary of the Kensington Treaty which the UK and German Governments signed last July to establish closer ties between the countries.

    British Ambassador to Germany, Andrew Mitchell, said: “As we mark the first anniversary of the Kensington Treaty, this project is a clear example of how strong UK-German cooperation delivers real benefits for both our countries. As the first direct energy link between the UK and Germany, NeuConnect will strengthen energy security, deepen our economic partnership, and support our shared climate ambitions. I am encouraged by the progress achieved so far, which demonstrates the value of closer bilateral partnership in the energy sector.”

    Italy’s Prysmian Group is in charge of the cabling program as the main contractor. Subsea cabling began in late 2024, with the cable-laying vessel (CLV) Leonardo da Vinci having completed works in UK waters in March, continuing into Dutch waters and on towards Germany.

    As for onshore works, it was reported in May that Siemens Energy had delivered all 14 transformers for the link. The 24-meter-high and 70-meter-wide converter station buildings in both the UK and Germany have reached full height, with cladding works well underway.

    Besides the construction, NeuConnect is working on reaching key commercial arrangements, IT systems and processes ahead of the start of operations. Earlier this year, Supercharge was appointed as the project’s market integration platform provider.

    Led by global investors Meridiam, Allianz, Kansai Electric Power and TEPCO, NeuConnect will create an “invisible energy highway” capable of transferring 1.4 GW of electricity, enough to power 1.5 million homes, in either direction, with converter stations on the Isle of Grain in Kent and Wilhelmshaven in northern Germany.

    Construction work at the UK site on the Isle of Grain began in the summer of 2023, with construction in Germany following in May 2024. The interconnector is expected to be operational by 2028.

    Power Your Brand With Offshore Energy ⤵️

    Take the spotlight and anchor your brand in the heart of the offshore world!

    Join us for a bigger impact and amplify your presence at the core hub of the offshore energy community!

    cabling energy link place UKGermany
    NCIJ NETWNCIJ NETWORK
    • Website

    Keep Reading

    Saipem highlights ‘key’ offshore installation milestone at Europe’s mega gas development

    Nuclear Energy Revival Puts Westinghouse in Prime Position

    Worley takes pre-FEED role on Roman goddess-named Dutch North Sea CCS project

    Who is Miatta Fahnbulleh, the radical-thinking new UK energy secretary? | Politics

    Fresh black gold discovery emerges as tie-back candidate for Norway’s flagship Barents Sea oil hub

    Did Miami Heat post link to LeBron James press conference video?

    Add A Comment
    Leave A Reply Cancel Reply

    Editors Picks

    The Guardian view on social care reform: Andy Burnham is right – this issue must be gripped | Editorial

    July 23, 2026

    Zelensky’s Dizzying U-Turn Is the Latest Zigzag in a Presidency Full of Them

    July 23, 2026

    Le parquet de Paris ouvre une enquête sur le site “libertin” Wyylde

    July 23, 2026

    Burnham’s review of prison early release scheme is causing chaos, says union | Prisons and probation

    July 23, 2026
    Latest Posts

    Trump slaps 50% tariffs on Canada and Carney vows to ‘intensify’ trade talks

    July 21, 2026

    How Two Brothers Dug for Dead Relatives: With a Shovel and a Kitchen Knife

    July 21, 2026

    Chile floods: Towns evacuated following heavy rain in Coquimbo

    July 21, 2026

    Subscribe to News

    Get the latest sports news from NewsSite about world, sports and politics.

    NCIJ Network is an independent digital news platform delivering trusted investigative journalism, European and global news, in-depth analysis, and fact-based reporting with accuracy, transparency, and integrity.

    Facebook X (Twitter) Instagram Pinterest YouTube

    The Guardian view on social care reform: Andy Burnham is right – this issue must be gripped | Editorial

    July 23, 2026

    Zelensky’s Dizzying U-Turn Is the Latest Zigzag in a Presidency Full of Them

    July 23, 2026

    Le parquet de Paris ouvre une enquête sur le site “libertin” Wyylde

    July 23, 2026

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    Type above and press Enter to search. Press Esc to cancel.