Close Menu
NCIJ Network NCIJ Network
    What's Hot

    Tech Transfer Won’t Work for U.S. Auto Industry

    November 13, 2026

    Video allegedly shows Muslim NYPD officers taking away woman’s dog for Shariah. Here’s what we know

    November 13, 2026

    Junior doctor burnout may put maternity patients at risk, regulator warns

    November 13, 2026
    Facebook X (Twitter) Instagram
    Trending
    • Tech Transfer Won’t Work for U.S. Auto Industry
    • Video allegedly shows Muslim NYPD officers taking away woman’s dog for Shariah. Here’s what we know
    • Junior doctor burnout may put maternity patients at risk, regulator warns
    • Communities around DRC’s Upemba National Park say conservation comes at a cost
    • We need to rethink climate action away from the Cop talks | Cop31
    • Some young disabled people to lose Pip in Milburn plan – but can apply to local fund | Welfare
    • UK ministers have no plans to publish explosive report on climate crisis | Environment
    • Canadian extractive firms displaced 300,000 in Africa since 1996, report says
    • About
      • Our Team
      • Editorial Policy
      • Editorial Independence
      • International Support
    • Trust & Standards
      • AI Usage Policy
      • Conflict of Interest Policy
      • Corrections Policy
      • Ethics Policy
      • Fact-Checking Policy
      • Source Protection
    • Get Involved
      • Guide for Sources
      • Support Independent Journalism
    • Legal
      • Cookie Policy
      • Privacy Policy
      • Terms of Use
    Facebook X (Twitter) Instagram
    NCIJ Network NCIJ Network
    Friday, November 13
    • Home
    • World
    • Ai
    • Business
    • Politics
    • Health
    • Crypto
    • Science
    • Technology
    • Cybersecurity
    • Defense & Security
    • Economy
    • Energy
    • Europe
    • More
      • Fact Check
      • Investigations
      • Opinion & Analysis
      • Environment
    NCIJ Network NCIJ Network
    Home»Energy

    Fit-out of NeuConnect’s converter stations in progress

    NCIJ NETWNCIJ NETWORKBy NCIJ NETWNCIJ NETWORKSeptember 25, 2026 Energy No Comments2 Mins Read
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Fit-out works are currently underway on the converter stations in Germany and the UK for NeuConnect, a high-voltage submarine cable that will create the first direct energy transmission link between the two countries.

    Source: NeuConnect

    The construction of the 24-meter-high, 70-meter-wide converter hall buildings reached full height earlier this year, allowing main contractor Siemens Energy to start the internal and external fit-out phase that will see key mechanical and electrical systems being installed.

    At the UK converter station, the transformers, each being 7 meters long, 5 meters tall and weighing over 200 tons, have been moved into position, while at both the UK and German sites work is underway to fit the transformers with equipment and accessories.

    As for the internal works on the converter stations, they include cable trays, ladders and heating ventilation and air conditioning (HVAC) ducting being installed throughout, while external works are continuing with cladding works underway in Germany and nearing completion in the UK. Other external works include installing guttering and drainage equipment, and preparing site roads for tarmacking to help form access routes across all parts of the converter station sites.

    Furthermore, in Germany, the AC switchyard has seen a number of trellis-type support towers constructed that will hold key overhead equipment.

    German converter station. Source: NeuConnect

    NeuConnect CEO Arnaud Grévoz said: “NeuConnect’s construction is moving into an important new phase as we start to install the key systems and equipment that will help to power this vital new UK-German energy link. With our onshore Converter Stations taking shape and offshore cabling works also well over halfway, we are making good progress and remain firmly on track.”

    Led by global investors Meridiam, Allianz, Kansai Electric Power and TEPCO, NeuConnect will create an “invisible energy highway” capable of transferring 1.4 GW of electricity, enough to power 1.5 million homes, in either direction, with converter stations on the Isle of Grain in Kent and Wilhelmshaven in northern Germany.

    Construction work at the UK site on the Isle of Grain began in the summer of 2023, with construction in Germany following in May 2024. The interconnector is expected to be operational by 2028.

    OE logo

    Power Your Brand With Offshore Energy ⤵️

    Take the spotlight and anchor your brand in the heart of the offshore world!

    Join us for a bigger impact and amplify your presence at the core hub of the offshore energy community!

    converter Fitout NeuConnects progress stations
    NCIJ NETWNCIJ NETWORK
    • Website

    Keep Reading

    SLB on multi-year integrated drilling quest with European oil & gas operator

    With restructuring done, Impact Oil & Gas turns into pure-play Namibia explorer

    ADES rig duo picks up multimillion-dollar assignments offshore India

    Main construction starts on central part of interconnection between Western Isles and UK

    Reservoir upside ups Amplitude Energy’s East Coast gas ante

    ADNOC widens its Asian footprint with decade-long LNG offtake deal

    Add A Comment
    Leave A Reply Cancel Reply

    Editors Picks

    Tech Transfer Won’t Work for U.S. Auto Industry

    November 13, 2026

    Video allegedly shows Muslim NYPD officers taking away woman’s dog for Shariah. Here’s what we know

    November 13, 2026

    Junior doctor burnout may put maternity patients at risk, regulator warns

    November 13, 2026

    Communities around DRC’s Upemba National Park say conservation comes at a cost

    November 13, 2026
    Latest Posts

    Your Comcast router doubles as a motion detector now – and a potential police informant

    August 19, 2026

    Taxpayers to fund clear-up of illegal dumps in West Yorkshire, Surrey and Kent | Waste

    August 19, 2026

    Tice should apologise to firefighters for ‘enjoy it’ remark on extreme heat, says Labour | Richard Tice

    August 19, 2026

    Subscribe to News

    Get the latest sports news from NewsSite about world, sports and politics.

    NCIJ Network is an independent digital news platform delivering trusted investigative journalism, European and global news, in-depth analysis, and fact-based reporting with accuracy, transparency, and integrity.

    Facebook X (Twitter) Instagram Pinterest YouTube

    Tech Transfer Won’t Work for U.S. Auto Industry

    November 13, 2026

    Video allegedly shows Muslim NYPD officers taking away woman’s dog for Shariah. Here’s what we know

    November 13, 2026

    Junior doctor burnout may put maternity patients at risk, regulator warns

    November 13, 2026

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    Type above and press Enter to search. Press Esc to cancel.